Mendota GREENBRIAR M-50 Operations Instructions Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 68
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
- 17 -
11
15
16
"
2
5
16
"
ELECTRICAL
JUNCTION
BOX
FRONT
GENERAL INSTALLATION INSTRUCTIONS
CAUTION: Each installation must conform to all local, state and national codes. Refer to the national fuel gas code and local zoning
and code authorities for details on installation requirements. The Mendota Fireplace must be vented to the outside in accordance with
the latest edition of the National Fuel Gas Code. In the absence of local codes, the installation must conform to the most current edi-
tion of the National Fuel Gas Code ANSI Z223.1, also known as NFPA 54. NOTE: The Mendota M-50 Fireplace is approved for mo-
bile home and bedroom installations.
CAUTION: The Mendota M-50 Fireplace may be installed in a manufactured (mobile) home after the first sale of the home. Manu-
factured home (mobile home) installation must conform with the Manufactured Home Construction and Safety Standard, Title 24
CFR, Part 3280, or, when such a standard is not applicable, the Standard for Manufactured Home Installations, ANSI A225.1/NFPA
501A, or CSA Z240.4-Gas Equipped Mobile Housing. Consult your local building official. Note: For mobile home installations unit
must be bolted to the floor and properly grounded.
HIGH ALTITUDE INSTALLATION INFORMATION: Prior to installing at altitudes higher than 7500, please contact the
Mendota technical service department for specific venting requirements and venting restrictions.
1. After selection of the desired fireplace location, prepare the rough opening using framing dimensions on page 10.
Be sure to also prepare opening to allow for co-axial vent).
2. Check to make certain all venting requirements and locations are being followed.
3. This Fireplace is designed for installation into rough framing. NOTE: FRAMING MATERIAL ABOVE FIREPLACE
MUST
MAINTAIN CORRECT CLEARANCE TO FIREPLACE AND VENT PIPES.
WARNING: One-inch clearance to sides & below and 2 inches clearance on top of horizontal sections and el-
bows.
4. NOTE: A removable panel in the enclosure for future visual inspection of flue connection is recommended.
5. Have an electrician install a 115-Volt supply to the junction box on lower right side of the fireplace cabinet. Connect
wires using wire nuts. Make sure the grounding wires are properly connected and that the installation conforms to
all local and national wiring codes.
6. Have gas supplier or qualified plumber install gas supply line to fireplace and connect to the ½” female connector.
Be sure gas and plumbing instructions (see Page 15 and 16) and all local and national codes are carefully followed.
IMPORTANT: Any safety screen, guard, glass, grill etc. removed
for servicing this fireplace must be replaced prior to operating this
fireplace.
BLOWER OPERATION
The blower output can be regulated with the rheostat (included).
NOTE: There will be a time delay in blower operation during
"heat-up" (approx. 20 min.) and extended blower operation during
"cool-down" of unit (approx. ½ hour).
OPERATION DURING POWER OUTAGES
The fireplace is designed to operate during power outages. The
blower will not operate during the power outage.
The M-50 Fireplace must be installed by a qualified service person.
Figure 11: Junction Box
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 67 68

Comments to this Manuals

No comments