FLUE VENTING REQUIREMENTS
NOTE: FOR LP GAS & HIGH ALTITUDE, SEE PG. 13
MAX
MAX
12
Figure 6: DXV42 Vertical & Horizontal Flex Vent Requirements when using Natural Gas
NOTE
: ONE 12” SECTION OF VERTICAL PIPE AND ONE 90
O
ELBOW CAN BE USED IF NO HORIZONTAL VENT
SECTIONS GREATER THAN 7” ARE USED.
ALL OTHER INSTALLATIONS MUST FALL WITHIN
ABOVE SHADED AREA.
NOTE: THE SHORTEST HORIZONTAL RUN OF 7”/6” ARE ACHIEVED USING EITHER THE 6” DURAVENT PIPE
OR THE AMERIVENT 7” PIPE. EITHER CAN BE USED AS THE MAXIMUM HORIZONTAL RUN.
NOTE: FOR LP GAS & HIGH ALTITUDE INSTALLATIONS, SEE PG. 13